From incorrect cable selection to missed inspections, some electrical defects can cost contractors thousands of dollars in repairs, delays, and penalties. Here's how to avoid seven of the costliest mistakes.
The electrical industry continues to evolve, and so does the way Ontario's licensed electrical contractors and master electricians interact with the ESA.
Even experienced electrical contractors know that mistakes on the job can be expensive. But what happens when a seemingly minor oversight turns into thousands of dollars in replacement materials, extensive rework, or even legal consequences?
In this two-part series, host Saira Husain sits down with Electrical Safety Authority (ESA) Technical Advisor Trevor Tremblay, to count down the Top 10 Most Expensive Defects encountered across Ontario, sharing real-world examples and practical advice to help contractors avoid costly mistakes.
While the actual cost of correcting these defects varies by project, the rankings reflect how frequently ESA encounters these issues rather than their actual dollar value. For many Licensed Electrical Contractors (LECs), understanding these common mistakes could mean the difference between a profitable project and an expensive lesson.
#10: Choosing the Wrong Cable Type
Selecting the wrong cable for an installation might seem like a straightforward mistake to correct, but depending on the length of the run and the materials involved, the financial consequences can be substantial.
One common issue involves incorrectly calculating conductor ampacity using the 90-degree column instead of the applicable 75-degree column. Underground installations can introduce additional complications when contractors fail to account for conductor temperature limitations or select cables that aren't approved for direct burial.
Trevor recalls one particularly expensive example involving a contractor who purchased high-voltage cable for an underwater installation.
“One of the largest or most costly defects I've seen is when someone bought a high voltage cable not rated for submersion to run in the water to an island,” he shares. “This cost someone $80,000 in cable that they couldn't use, and then they had to purchase the correct cable to get the job done.”
The takeaway for contractors: Verify cable ratings, ampacity calculations, installation conditions, and voltage drop before ordering materials. A cable that works on paper may not be suitable for the actual installation.
#9: Failing to Properly Support Vertical Risers
High-rise construction presents unique electrical installation challenges, particularly when conductors and cables run vertically over significant distances.
Under the Ontario Electrical Safety Code (OESC), vertical conductors and cables must be supported at appropriate intervals, as outlined in Table 21. Without proper support, the weight of long conductor runs can place excessive stress on the installation.
“We're definitely seeing a lot of issues with this recently, especially in high rise buildings because the length runs from top to bottom.”
Correcting these defects after installation can require cutting into walls or concrete, adding junction boxes, and installing approved support methods. Beyond the additional labour and materials, these corrections can delay construction and affect the finished appearance of a building.
Trevor also discusses alternatives, including specialized vertical cables designed to support their own weight without additional internal conductor support.
The takeaway for contractors: Plan vertical conductor support early. Review Table 21 and confirm suitable wiring methods before installation to avoid costly rework and delays.
#8: Working from Outdated Electrical Plan Review Drawings
When electrical projects move from design to tendering and construction, keeping drawings consistent is essential. But what happens when the plans submitted to ESA for review don't match the drawings contractors are using to price and complete the work?
According to Trevor, this disconnect can create costly problems, particularly when conductor sizes or other electrical specifications change between drawing versions.
“The last thing we want is Version One being submitted to plan review and then the tendering documents are Version Four, things have changed, conductor sizes have changed.”
Although the designer is typically responsible for submitting plans for review, electrical contractors can still face significant financial consequences when they order or install materials based on drawings that don't meet Code requirements.
On larger projects, correcting cable installations can cost tens or even hundreds of thousands of dollars.
The takeaway for contractors: Confirm that you're working from the correct drawings and that the version submitted for plan review matches the project's current design. Identifying discrepancies before purchasing materials is far less expensive than discovering them after installation.
#7: Missing or Late Plan Review Submissions
Closely related to version control is another expensive oversight: failing to submit required plans for review before work begins. Even when the responsibility falls to the designer, contractors can experience the financial consequences of a missed submission.
Without a completed plan review, potential Code compliance issues may not be identified until construction is already underway.
Trevor offers a practical recommendation for contractors preparing bids:
“One word of advice is always ask if it's been submitted to plan review during your tendering documents because that could help you in your cover letter.”
If the required review hasn't been submitted, the project could face significant delays. Depending on the size and complexity of the installation, those delays could stretch for weeks or months.
Proceeding without the review also means accepting the risk of correcting any non-compliant work identified later.
The takeaway for contractors: Ask about plan review status during the tendering process, not after you've started the job. A simple question upfront could help protect your project schedule, budget, and bottom line.
#6: Neglecting Preventive Electrical Maintenance
Not every expensive electrical problem begins with a new installation.
Aging electrical infrastructure can create significant safety hazards, unexpected outages, and costly repairs, particularly in multi-residential buildings and commercial properties.
While responsibility for maintaining electrical equipment generally rests with the asset owner, contractors play an important role in identifying potential problems and advising customers before equipment fails.
Trevor has encountered situations involving deteriorating switches that failed to operate correctly, sometimes creating serious risks for workers.
“I think for the contractor, what they should be looking for is to do their homework, really look at the switch beforehand. And if you don't feel comfortable operating that switch, please get the utility to disconnect the power.”
He also encourages contractors to recommend preventive maintenance to their commercial and property management clients.
“I really think they should try and encourage business owners to do preventive maintenance, operate switches, thermal scans, anything they can just to prevent this,” Trevor explains. “We've seen a lot of aging infrastructure fail, displacing hundreds of people in apartments, strip malls not being able to reopen on time, which costs everyone money. A little bit of preventive maintenance goes a long way.”
For contractors, preventive maintenance isn't just about avoiding emergency repairs. It's also an opportunity to help customers reduce downtime, protect occupants, and extend the useful life of their electrical infrastructure.
The takeaway for contractors: Encourage customers to invest in routine electrical maintenance and assess aging equipment before operating it. Preventive maintenance can help avoid dangerous failures, prolonged outages, and expensive emergency work.
#5: Concealing Wiring Before ESA Acceptance
Few mistakes can turn a nearly finished project into an expensive repair job faster than covering electrical wiring before it's been inspected or accepted by ESA.
Whether it's drywall installed over rough-in wiring or underground cables buried before inspection, concealing electrical work prematurely can result in significant additional labor and material costs.
“If you drywall up all the wiring or bury all your wiring before we inspect it, we have every right to make you expose all wiring.”
Depending on the circumstances, contractors may need to remove drywall, insulation, vapor barriers, or excavate buried wiring so inspectors can verify compliance.
The process itself can also create additional damage to previously installed electrical components. Trevor recalls seeing repairs reach $40,000 simply because drywall was installed before the electrical inspection.
“Our rules say that everything has to be inspected before you conceal it,” he explains. “We have to inspect it or give you permission to conceal it.”
The takeaway for contractors: Coordinate inspections with your construction schedule and obtain ESA acceptance or permission before concealing electrical work. A delay in scheduling an inspection is far less costly than tearing apart a completed installation.
#4: Failing to File a Notification of Electrical Work
Coming in at number four is an issue ESA regularly emphasizes: completing electrical work without submitting the required notification.
For licensed electrical contractors, notifications are a fundamental part of the electrical safety process. They allow ESA to provide safety oversight and help ensure electrical installations meet the requirements of the OESC.
Failing to submit a notification can expose contractors to serious consequences, including fines and prosecution.
“For contractors, working without a notification can lead to fines, convictions, or worse, jail time. We've actually had experiences where we've seen the fines range from $5,000 to 500,000,” Trevor offers. “I don't know about you, but I can't afford $500,000.”
But the consequences aren't only financial.
Trevor discusses a case involving a fatality resulting from improper electrical work, highlighting how the absence of the notification and inspection process can have devastating consequences. He also points to ESA statistics indicating that unlicensed electrical work has been found to have four times as many defects and safety issues as work performed by licensed electrical contractors.
For contractors, the message is clear: electrical notifications aren't simply administrative paperwork. They're an essential part of protecting workers, property owners, and the public.
The takeaway for contractors: File required notifications of work and help customers understand why the process matters. Following the proper notification and inspection requirements protects both public safety and your professional reputation.
Avoiding Expensive Defects Starts Before the Work Begins
Although the seven defects covered here involve different aspects of electrical work, they share a common theme: many of the most expensive problems can be avoided through better planning, communication, and attention to Code requirements.
Before starting your next project, consider whether you've:
- Verified cable types, ampacity calculations, and installation requirements.
- Planned proper support for vertical conductor runs.
- Confirmed that plan review drawings match current construction documents.
- Checked that required plan reviews have been submitted.
- Assessed existing electrical equipment for potential maintenance or safety concerns.
- Scheduled inspections before concealing electrical work.
- Submitted the required electrical notifications.
Taking these steps early can help reduce costly corrections, protect project timelines, and reinforce the professional standards expected of Ontario's licensed electrical contractors.
Coming Up in Part 2: The Three Most Expensive Electrical Defects
Think an $80,000 cable mistake is expensive? We’re not finished yet.
In Part 2 of this Grounded in Ontario series, Trevor reveals the Top Three Defects in the countdown, including mistakes that can have serious financial, legal and safety consequences.
“I can say,” Trevor hints, “they involve installing certain items and maybe jail time.”
Subscribe to Grounded in Ontario wherever you listen to podcasts so you don’t miss the next episode.
Have a Question for ESA?
Have a technical question or a topic you'd like to hear discussed on a future episode of Grounded in Ontario? Email podcast@esasafe.com. Your question could be featured in an upcoming episode!
Follow Grounded in Ontario wherever you listen to podcasts for electrical safety insights, technical guidance, and best practices for Ontario's licensed electrical contractors and master electricians.
Always consult the current edition of the Ontario Electrical Safety Code, applicable ESA bulletins, and technical guidelines for the requirements relevant to your installation.
Follow Grounded in Ontario wherever you get your podcasts. Got a technical question or an idea for an upcoming topic on our show, we want to hear from you! Email us at podcast@esasafe.com.